Gidgegannup Waterfall Process

Goal: Replace a pre-existing waterfall that was falling apart due to poor engineering.

This was a very large project. And shown here are some of the development stages. Beginning with the core structure, cast from concrete panelling, slate tile cladding was added, and the waterfall was finally completed with the planting of native shrubs into the flower boxes on either side.

The design called for water to be pumped from the dam at the end of the water feature, a considerable distance back to the top of the water feature.

Engineered, fabricated, delivered, and installed by Artforms WA.